AVC Grid-connected Commissioning Test
After completing the AVC application deployment and performing open-loop and closed-loop tests at the substation in accordance with relevant standards, joint automatic voltage control (AVC) functional testing between the power station side and the dispatching center is conducted. This includes verification of teleindication, telemetry, and teleadjustment functions to ensure the safe and stable operation of subsequent AVC closed-loop control.